Inspections

Tanya and Watson decided to go with me to the hangar this evening since it was raining (nothing better to do). I sanded on the wheel pants and Tanya did some much needed organization and removed the rear empennage fairings for control hardware inspection. I checked out the elevator and horizontal stab once she got the fairing and access panels off and we put it all back together. “Team building” :).

 
  
 

Comments are closed.